Prices |
All prices are in Euro net, ex our or manufacturer factory (EXW Incoterm 2020), without packing, crating, transport, insurance, brokerage and customs duties or taxes which might apply. |
|
Payment |
90% prior to delivery, and 10% against delivery confirmation, not to exceed 30 days. |
|
Installation |
The installation will be performed at your plant by a factory trained technician. The buyer is responsible for the unload of the machine and its transfer to the production floor. Please refer to the pre installation procedure, available from our Service Department. Installation-costs are not included. |
|
Training |
Training will be held on Site. Trainings ordered together with machine packages have to be attended within 24 months after delivery of the machine, otherwise the entitlement will expire. Training-Costs are not included and will be charged separately. |
|
Delivery |
To be discussed and agreed between both parties. |
|
Acceptance |
The machine will be considered accepted once manufacturers standard speed and accuracy tests have been completed successfully according to machine specifications. |
|
Warranty |
1. On Systems |
Full warranty during the first year on parts and labor. |
In case of machine down situation, Material will be shipped by UPS Express. |
2. On Accessories and Options |
One year on all new original accessories and options. |
3. On Spare parts |
Six months warranty on all new original spare parts. |
Three months warranty on all refurbished parts and no warranty for used parts. |
4. On Refurbished systems |
Three months warranty on used or refurbished systems, or according to special agreements. |
![]() 5. General warranty conditions |
|
Guarantee will only be granted if original parts and accessories are used which were bought from authorized dealers. |
Defects due to mis-operation, missing or incorrect maintenance, defects due to external influences as well as consequential damages (production loss, etc.) are excluded from the warranty. |
|
Validity |
Quotations are valid for 30 days from the date of issue. |
|
General |
The "General Conditions for the Supply and Erection of Mechanical, Electrical and Associated Electronic Products" Orgalime SE 01 of September 2001, are to be taken into consideration. |
|
Dispute and Arbitration |
Any dispute or difference arising between the parties hereto shall be resolved according to german law. The application of the Convention on contracts for the international sale of goods (CISG) is excluded. The competent court in every and all respects shall be the court at the domicile of Smartlink-SMT GmbH, in Nuremberg/Germany. |